Our professional engineering staff will work with you to ensure that each job is completed to the performance standards required.
Hydrogeologic Studies—Completed Projects

City of Cape Girardeau, Missouri
City of Keytesville, Missouri
City of Athens, Illinois

City of Cape Girardeau, Missouri
 
Objective:
Design 10 MGD well field
Location:
Mississippi River flood plain
Test Holes:
13 test holes with split spoon samples on 5-foot centers
Piezometers:
2-inch PVC installed in each test hold
Test Pumping Well:
18 inch PVC test pumping well
Pump Test:
7-day pump test at 2100 gpm
Conclusion:
Construct 1800 gpm wells to meet 10 MGP supply, wells must have 500 foot spacing to minimize interference
 
[back to top]
 
City of Keytesville, Missouri
Objective:
  Develop new 100,000 GPD capacity well field
Test Holes:
  Four test holes were constructed to locate the area for the test pumping wells. Four additional test holes with 2-inch piezometers were constructed at the test well location split spoon sampling was performed on 5 foot intervals.
Test Pumping Well:
  6-inch PVC test pumping well
Pump Test:
  Two pump tests were performed. The initial 24-hgour test showed boundaries and a second 7-day test was required.
Conclusion:
  Construct two 100 gpm wells at the site to meet demand
     
[back to top]
City of Athens, Illinois
Objective:
  Expand existing well field on the West side of the Sangamon River to provide an additional 300 gpm supply
Test Holes:
  11 test holes with split spoon samples on 5-foot intervals
Piezometers:   2-inch PVC piezometer installed in 4 test holes
Test Pumping Well:
  6-inch PVC test pumping well
Pump Test:
  24-hour pump test at 193 gpm
Conclusion:
  Construct 300 gpm well at the site
     
[back to top]

 

 