Our professional engineering staff will work with you to ensure that each job is completed to the performance standards required.
Finished Projects—Illinois

BWP was contracted to repair a spare 21,000 GPM Water Intake Pump. After the pump was repaired, the assembly was installed at the power plant. The installation was extremely challenging since the pump was located about 40 feet below ground with very poor overhead access. Our experienced project managers and superintendents ensured that the project was completed on time and on budget.

BEFORE

AFTER

 

Copyright 2007-2009 Brotcke Well & Pump  |  Contact Us